Project: Fully Automated Pharmaceutical Distribution Center
Client: Al Dawaa Pharmacies
Location: Riyadh, Saudi Arabia
Year:
• Phase 1: 2021
• Phase 2: 2023
Scope: Design, Supply, Installation and Commissioning of Fully Automated Pharmaceutical Distribution
Center.
-
Phase 1:
• A‐Frame SDA System with approximately 1.320 channels
• OSR Shuttle System Conveyors
• OSR Shuttle System with 2 aisles, 23 modules, 30 levels (27.600 static locations)
• Totes for the OSR Shuttle System (36.480 totes)
• Conveyors including tote buffer, manual stations, loop, spiral conveyor and empty tote handling
• Stacker/Destacker
• Vertical Conveyors
• Lid Turning Device
• Strapping machine
• Scale
• LBA Label printing station
• Hardware, Software including KiSoft SCADA, SPS , Network, RF Hardware and Software‐licenses
• Testing and OnSite Assistance
• CIT Customer Integration Tests
• Extension of OSR Shuttle system on 2nd level
• SDA with 1,320 channels on 2nd level
• RFX Scanners Hardware including set‐up for 2nd level
• Flow rack channels on the OSR for the support of the SDA on 2nd level
• Tote conveyor connection on 2nd level
• PLC Hardware including Installation for 2nd level"
• Single Wire Network
• Serialization of SDA and OSR System
• Invoice Station ABB for document insertion
Phase 2: Shuttle system Extension
• Mechanical/electrical components for Pack-to-Patient lines (P2P)
• Vision control stations
• Manual induction workstations
• Label printing and application devices
• Sorting unit and bagging unit (biodegradable plastic)
• General hardware & software
• PLC
• Full Integration to SAP EWM